We went out to look at the house today and saw that they did so many updates in just week. The brick is all finished, they graded the lot, removed the old tree stump, put in the kitchen and bathroom cabinets, started the tile in the master bath, put up all the trim and stair railings and put the shelves and doors on all the closets. Wow!~

The back yard looks fantastic now with the grading completed.
This is my favorite picture from the back yard.
The 2nd bathroom upstairs has the closet finished and cabinets in. The tile is sitting outside the door, ready to be put in.
The walls in the master bath shower are tiled.
The floor is tiled in the master bath, just needs the grout.
This is the railing going upstairs. The railing and fireplace mantel are going to be stained with a cherry finish.
Kitchen cabinets! The big hole is where the ovens are going to go.

Sunday, September 27, 2009
Awww. . .
Daisy loves her new bed! She curls up on here for naps during the day. Ryan and I camped out in the living room on the air mattress next to her bed last night. She was so cute this morning. She came up and laid in between us, put her head on the pillow, her paws on Ryan's chest and cuddled with us. I wish I had my camera for that!
Monday, September 21, 2009
House Updates
We went out to the house on Saturday with Shelly and the girls. They have been working hard on it this week. The brick is partially complete, the cabinets had been delivered, the drywall mudding and priming were all complete and the porch construction has begun. It won't be long now!!!

The kitchen and bathroom cabinets have arrived :)


The garage
Ryan and the girls


The kitchen and bathroom cabinets have arrived :)


The garage
Ryan and the girls
Saturday, September 12, 2009
Drywall and Other Updates
We stopped by the house Friday night and the guys were still there working on the drywall. Most of the main floor was complete and they had started on the upstairs. The house feels so different now on the inside. We can't believe how fast the process has been!
The view coming down to the main floor.
The kitchen/nook from the living room view.
The office
Supporting the local economy. . .
They finally finished painting the exterior wood trim.
The brick has been dropped off to start the exterior.

The basement egress window is in.