Sunday, October 25, 2009

Less Than 3 Weeks To Go!

Well, we thought we better post some photos before we
really got into trouble :)
We stopped out at the house today on the way home from Ohio. They put on the garage doors and completed most of the inside work. There is not too much left to do before our walk thru on Nov 4th. The final closing date is set for Nov 12th. We are so excited!The main floor 1/2 bathView of the living room from the top of the stairsThe foyer view from the top of the stairsThe guest bathroom upstairsUpstairs hallwayMaster bedroom closetMaster bath showerMaster bath - missing one sinkThe ovens - all of the included appliances are inThe staircase

Sunday, October 4, 2009

Getting Ready to Paint!

The vinyl siding is all up, the porch has been poured and they are getting ready to paint! The stair railings and fireplace mantel have been stained but are now covered up for painting.The closets all have shelves now.Master bedroom closet. The 2 upstairs bathrooms have been tiled but are now all covered up for painting.

Braylen Jose Gutierrez

Maddie's 8th Birthday

Sunday, September 27, 2009

So much happened in just 1 week!

We went out to look at the house today and saw that they did so many updates in just week. The brick is all finished, they graded the lot, removed the old tree stump, put in the kitchen and bathroom cabinets, started the tile in the master bath, put up all the trim and stair railings and put the shelves and doors on all the closets. Wow!~The back yard looks fantastic now with the grading completed.This is my favorite picture from the back yard.The 2nd bathroom upstairs has the closet finished and cabinets in. The tile is sitting outside the door, ready to be put in.The walls in the master bath shower are tiled.The floor is tiled in the master bath, just needs the grout.This is the railing going upstairs. The railing and fireplace mantel are going to be stained with a cherry finish.Kitchen cabinets! The big hole is where the ovens are going to go.

Awww. . .

Daisy loves her new bed! She curls up on here for naps during the day. Ryan and I camped out in the living room on the air mattress next to her bed last night. She was so cute this morning. She came up and laid in between us, put her head on the pillow, her paws on Ryan's chest and cuddled with us. I wish I had my camera for that!

Monday, September 21, 2009

House Updates

We went out to the house on Saturday with Shelly and the girls. They have been working hard on it this week. The brick is partially complete, the cabinets had been delivered, the drywall mudding and priming were all complete and the porch construction has begun. It won't be long now!!!The kitchen and bathroom cabinets have arrived :)The garageRyan and the girls

Saturday, September 12, 2009

Drywall and Other Updates

We stopped by the house Friday night and the guys were still there working on the drywall. Most of the main floor was complete and they had started on the upstairs. The house feels so different now on the inside. We can't believe how fast the process has been!The view coming down to the main floor.The kitchen/nook from the living room view.The officeSupporting the local economy. . .They finally finished painting the exterior wood trim.The brick has been dropped off to start the exterior.
The basement egress window is in.